|
| image = S2-Line DMU at Chinglungchiao.JPG | image_width = 265px | image_alt = | caption = | type = Commuter rail | system = BCR | status = Operational | locale = | start = Beijing North | end = Yanqing (Nancaiyuan) or Shacheng | stations = 9 | routes = | ridership = | open = 6 August 2008 | close = | owner = | operator = Beijing Railway Bureau | character = | depot = | stock = | linelength = 77.07 km | tracklength = | notrack = | gauge = 〔http://www.lrta.org/world/worlda-e.html#CN〕 | el = | speed = 160 km/h (maximum service speed) | elevation = | website = | map = 265px | map_state = collapsed }} Line S2 () is the first line of BCR to begin operation. Opened on August 6, 2008, it runs from the Beijing North Railway Station, near Xizhimen, to Badaling in Yanqing County, following the old Beijing-Zhangjiakou Railway, and provides faster, more frequent and convenient service than preexisting trains. The line is currently in length with six stations: ==Phase I== 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line S2, BCR」の詳細全文を読む スポンサード リンク
|